How to Prevent Short Shipments of Small Parts

Written by Sciotex Engineering
In this article

Short shipments of small parts usually come from counts that were estimated rather than counted: weighing with an out-of-date piece weight, hand counts on a busy shift, or a supplier’s short count passed straight through. To prevent them, count every piece at the points where quantity changes hands (receiving, kitting and packing), record each count against the order, and fix the causes the records reveal.

This article is part of our automated counting guide. It is written for quality, customer service and operations leaders dealing with short-count complaints, credits and chargebacks.

In short

  • Most short counts start with an estimate, not a miscount.
  • Check quantity where it changes hands: receiving, kitting, packing.
  • A count record per order settles disputes with facts.
  • Over counts cost money too: parts given away to stay safe.

Where short counts come from

SourceHow it happensFix
Weight countingPiece weight varies between lots, or the sample weight was set on unusual partsCount pieces instead of weighing, or re-sample often
Hand countingFatigue, interruptions and rounding on large quantitiesAutomate the count; keep hand counts for small, odd orders
Supplier short countsIncoming lots accepted at the label quantityVerify at receiving; see receiving count verification
Packing and kitting errorsA bag topped up by hand, a part type missed in a kitLink the count to the bag; verify kits; see count-and-bag
No recordNobody can prove what shippedStore the count with order, lot, time and operator

The cost of a short shipment

A short shipment costs more than the missing parts: expedited freight for the balance, credits or chargebacks, the hours spent investigating, and a line stopped at the customer if the parts were for production. Many shippers respond by overfilling to stay safe, which gives product away on every order. For a worked example of the costs of counting by hand, see the true cost of counting parts by hand.

A short-shipment prevention plan

  1. Measure it. Log every short-count complaint with part, quantity, order and how it was counted.
  2. Find the counting point responsible: receiving, kitting, packing, or the supplier.
  3. Replace estimates with counts at that point, starting with the parts that cause most complaints.
  4. Record every count against the order so disputes are settled with data.
  5. Verify the counter with reference batches; see how to verify count accuracy.
  6. Review monthly: short-count complaints, overfill, and time spent investigating.

Using count records to settle disputes

When a customer reports a short bag, a stored count with time, operator, part and lot shows what left the building. Sometimes the shortage is real and points to a specific station; sometimes the count was right and the loss happened downstream. Either way, the record turns an argument into an investigation.

Tired of short-count credits?

Sciotex counting machines count every piece and store a record of every count. Send us your parts for a free counting test. Designed, built and supported in the US, with no subscription or support contract required.

See our counting machines

Frequently asked questions

What causes short shipments of small parts?

Usually estimated counts: weighing with a poor piece weight, hand counts on large quantities, supplier short counts accepted at receiving, or kits topped up by hand.

How do you prevent short shipments?

Count every piece where quantity changes hands (receiving, kitting and packing), store a count record against each order, and fix the counting points the records show are responsible.

Do counting scales cause short shipments?

They can. Scales estimate counts from total weight, so piece-weight variation can produce short or over counts, especially on large quantities of small parts.

How can we prove what quantity we shipped?

Store each count with the order, part, lot, time and operator. That record shows what left the building if a customer disputes a shipment.

Is overfilling a good way to avoid short shipments?

It avoids complaints but gives product away on every order. Counting accurately removes the need to overfill.

Related articles

Written by

Sciotex Engineering

The Sciotex engineering team has designed and built vision, automation and test systems since 1997.

Have an inspection problem to solve?

Talk it through with a Sciotex engineer.

In this article
Have a counting problem to solve?

Talk it through with a Sciotex engineer.

Next step

See your parts counted