Whether to build test equipment in-house, buy an off-the-shelf tester or use a test system integrator depends on four things: how standard the test is, how many systems you need, whether your team has time to build and support it, and how long it must run. Standard tests suit off-the-shelf testers; one-off lab rigs suit in-house builds; production testers that must be reliable, documented and supported for years usually suit an integrator.
This article is part of our complete guide to automated test equipment (ATE). It is written for test engineering managers and the operations leaders who approve test equipment budgets.
In short
- Off-the-shelf fits standard tests on standard products.
- In-house fits simple or short-lived rigs when engineers have time.
- An integrator fits custom production testers that must run for years.
- The hidden cost of in-house builds is support after the engineer who built it moves on.
The three options compared
| Build in-house | Buy off-the-shelf | Use a test system integrator | |
|---|---|---|---|
| Best for | Lab and R&D rigs, simple fixtures, short-lived tests | Standard tests on standard products (cable, battery, common interfaces) | Custom production testers, many signal types, regulated or long-life products |
| Speed to first result | Fast for simple rigs; slow if engineers are busy | Fastest | Moderate; requirements and design first |
| Fit to your product | Exact | Limited to what the product supports | Exact |
| Documentation and support | Often thin; depends on one person | Vendor manuals and support | Delivered with the system |
| Long-term risk | Knowledge leaves with the builder | Vendor discontinues the product | Depends on the integrator’s longevity and handover |
Questions that decide it
- Is the test standard? If a product category tester already does it, buying is usually cheapest.
- How many stations, for how long? One rig for six months favors in-house; several production stations for ten years favor a documented, supported build.
- Who will maintain it? Name the person who will fix it at 2 a.m. in five years. If you can’t, plan for documentation and outside support.
- What does a wrong result cost? Production test that releases product needs capability studies, traceable data and controlled software. See gage R&R for automated test systems.
- Does your team have the time? Engineers pulled onto a tester aren’t working on the product.
Hybrid approaches
- Integrator builds, your team maintains. Specify source code, documentation and training as deliverables.
- Your team designs the test, an integrator builds the station. You keep the test knowledge; the integrator handles fixtures, wiring and software structure.
- Off-the-shelf instruments, custom software. Standard hardware with test software written for your product. See automated test software.
If you use an integrator, ask for
- Source code and drawings delivered with the system, owned by you
- A factory acceptance test against written criteria
- Hardware chosen for availability over the system’s life
- Support available without a mandatory contract
Weighing build vs buy for a tester?
Sciotex designs and builds custom test systems on any hardware and language, including NI and LabVIEW, with source code and documentation delivered. Support contracts are available but not required.
Frequently asked questions
Buy off-the-shelf for standard tests, build in-house for simple or short-lived rigs when engineers have time, and use an integrator for custom production testers that must be reliable and supported for years.
Engineering time taken from product work, thin documentation, and support risk when the person who built the tester leaves or moves to another project.
When the test is custom, several stations are needed, results release product, or the tester must run and be supported for many years.
Source code and drawings you own, a factory acceptance test against written criteria, hardware chosen for long availability, documentation, training and optional support.
Yes. Common splits are your team designing the test while the integrator builds the station, or the integrator building it and your team maintaining it with full documentation.