First pass yield (FPY) is the share of units that pass a process step the first time, with no retest, rework or repair. On a test line, a low FPY has two possible causes: the product really is failing, or the tester is failing good product. Finding out which comes first, because the fixes are completely different.
This article is part of our complete guide to automated test equipment (ATE). It is written for test, quality and continuous improvement engineers working on yield and retest rates.
In short
- FPY = units passing first time ÷ units tested.
- Multiply step FPYs to get rolled throughput yield across the line.
- Units that fail, then pass on retest with no repair, point at the tester.
- Fix the measurement system before chasing product causes.
How to calculate first pass yield and rolled throughput yield
FPY for one step is units that pass first time divided by units entering the step. For a line with several steps, rolled throughput yield (RTY) multiplies them, because a unit has to pass every step first time to come off the line clean.
| Step | First pass yield |
|---|---|
| Functional test | 98% |
| Calibration and trim | 95% |
| End-of-line test | 97% |
| Rolled throughput yield | 0.98 × 0.95 × 0.97 = 90.3% |
Each step looks healthy on its own, but almost one unit in ten needs some form of retest or rework somewhere on the line.
Product or tester? Reading the retest data
| Pattern in the data | Most likely cause | Next step |
|---|---|---|
| Failed unit passes on immediate retest, no repair | Tester: contact, noise, settling, limits too tight | Gage R&R on that measurement |
| Failures cluster on one station or fixture | Tester: station-to-station difference | Compare stations with the same units |
| Failures cluster by shift, operator or time of day | Handling, warm-up or environment | Check loading method and temperature |
| Failures follow a component lot or supplier | Product | Containment and supplier quality |
| Failures are near one limit, never the other | Offset in the measurement or a limit set wrong | Check calibration and the limit basis |
| Failures repeat after repair and retest | Product or a real design margin issue | Failure analysis |
Log the measured value, not just pass or fail, and record whether a unit was retested and whether anything was repaired. Without that, FPY can’t tell you which row you are in.
What a false failure costs
Take a line testing 2,000 units a day with a 3% false failure rate and a 4-minute retest. That is 60 retests and 4 hours of retest time a day. At a $25/hour loaded labor rate over 250 working days, it is $25,000 a year in labor alone, before tester capacity, delays and the risk that an operator learns to retest until a unit passes.
That last risk matters most. When retest-until-pass becomes routine, real failures get through, and FPY reports stop meaning anything.
Raising FPY on a test line
- Measure the tester first. Run a gage R&R study on the measurements behind most failures.
- Match the stations. Calibrate and compensate so the same unit reads the same on every station.
- Fix contact and fixturing. Worn probes and loose connections are the most common cause of intermittent fails. See test fixtures.
- Revisit the limits. Limits should come from the product specification and the measurement uncertainty, not from habit.
- Control retests. Allow one automatic retest at most, log it, and flag units that pass only on retest.
- Then chase product causes with the cleaner data: lot, supplier, process step.
Is it the product or the tester?
Sciotex designs and improves automated test systems on any hardware and language, including NI and LabVIEW, and can assess an existing tester’s repeatability and station matching. No subscription or support contract required.
Frequently asked questions
First pass yield is the percentage of units that pass a process or test step the first time, without retest, rework or repair.
Multiply the first pass yields of every step in the line. Three steps at 98%, 95% and 97% give a rolled throughput yield of about 90.3%.
If failed units pass on immediate retest with no repair, or failures cluster on one station or fixture, the tester is the likely cause. A gage R&R study confirms it.
No. A unit that passes only on retest did not pass first time. Count retests separately so you can see how much yield the tester is costing you.
It depends on the product and the step, but the trend and the split between real and false failures matter more than one target number.